Plan the first order with clear assumptions.
Minimum quantities and production guidance help frame an enquiry. Formula complexity, materials, packaging and agreed testing can change the project.

An initial planning reference.
These confirmed guidelines are not a quotation or dispatch commitment. Final MOQ, manufacturing scope and schedule must be confirmed for the specific product.
| Requirement | Minimum order guidance | Production guidance |
|---|---|---|
| Bulk powders | 5 MT per product | 15 days |
| Bulk capsules or tablets | 5 MT per product | 30 days |
| Private label retail packs | 1,000 finished units per SKU | Confirm by formula and pack |
| Gummies | 50,000 pieces | Confirm after development review |
| Effervescent tablets | 50,000 tablets | Confirm after development review |
Bulk ingredient minimums
Bulk order minimum: 5 MT per product.
MT means metric tonnes (1 MT = 1,000 kg). The minimum is per product. Finished retail packs and paid samples are quoted separately.
Catalogue bulk sourcing list
Moringa leaf powder; Ashwagandha root powder or root extract; Neem powder for cosmetic use; wheatgrass; ginger; holy basil (Tulsi); spirulina; turmeric; Brahmi; Giloy; Shatavari; and liquorice (Yastimadhu).
Readiness comes before the production clock.
Agree when the quoted timeline begins. Development, approvals and shipment transit can need additional time.
- 01
Agree the product
Confirm formula, specification and commercial requirements.
- 02
Prepare the pack
Approve artwork and confirm material readiness.
- 03
Manufacture
Apply the project’s agreed production schedule.
- 04
Complete the delivery plan
Allow separately for agreed testing, dispatch and shipment transit.

A quantity is more than a number.
The practical batch depends on formula, processing and packaging. Printed materials may have separate supplier minimums. Agree development samples and trial batches separately from the commercial order.
If your opening quantity is below the guidance, state it directly and explain the development or launch stage. A useful discussion starts with the intended product and commercial context, rather than assuming that every format shares one minimum.
Distinguish kilograms, pieces and finished packs. Confirm the applicable minimum before committing to a launch plan or printed components.
Send a quotation brief that can be assessed.
- Product name, formula or ingredient specification.
- Required quantity in kilograms, pieces and/or finished packs.
- Pack size, count and artwork requirements.
- Target delivery location and intended launch date.
- Required documents and buyer-specific testing.
Identify which details are approved and which remain open. Formula, testing or packaging changes may affect both quantity and timing; ask for their effect to be confirmed for the proposed project.
Tell us the batch you have in mind.
Share the intended quantity, format, pack and timing so the applicable minimum and scope can be discussed.
